If a temporary job trailer is shown on the plans submitted through Plans Review and reviewed, once final approval has been granted, a Building Permit will need to applied for through the Building Inspections Department.
If a temporary job trailer is not shown on the approved Plans Review plan set, a separate site plan submitted to the Planning Department along with a Zoning Permit will be required for approval. Once the Zoning Permit has been approved and issued a Building Permit can then be reviewed, approved and issued.
Once a Building Permit is issued, an electrical permit can be applied for by a licensed electrician.
In cases where no grading and total gravel area is less than 5,000 sq. ft., it is possible to place job trailer prior to having an LDA permit, but applicant must verify with ACC Transportation and Public Works Department prior to trailer installation in such circumstances.
If a new road access is required from an ACC ROW, a Driveway Permit or approval from GDOT (if applicable) are required. No permit is required if using existing access for job trailer.
If a job trailer is for construction purposes only, ADA accessibility is not mandatory.
If an existing fire hydrant is available near job trailer, a temporary fire hydrant meter may be requested by submitting an application to Building Inspections.
Section7.1.6 - Job Trailers: Sec. 7-1-6. a.2, a special building permit for a limited time shall be obtained before the erection of temporary structures such as construction sheds, office trailers, seats, canopies, tents, and fences used in construction work or for temporary purposes such as reviewing stands. Such structures shall be completely removed upon the expiration of the time limit stated in the temporary permit.