PUD Cross Connection Inspection Resource Documents

Overview

  • Notify the Cross Connection Coordinator by phone or e-mail (backflowsandFOG@accgov.com / (706) 613-3479) at least 48 hours prior to installation of backflow devices.
  • Inspections will ensure the proper installation and location of the required assemblies. 
  • Installations can be viewed in the Cross Connection Manual.
  • The installation inspection will consist of the proper sized box or above ground enclosure, gravel and the proper backflow assembly. 