Carriage Lane Culvert Replacement

Carriage Lane Culvert Replacement Project

Funding Source: Stormwater Utility Enterprise Fund, General Capital, SPLOST

Project Budget: $1,584,797

Status:   Construction

Project Description: Carriage Lane is a dead-end road and the culvert under Carriage Lane has an extensive and non-reparable buckling due to excessive rust and loss of soils that TPW repaired multiple times. The project includes replacing the failed 12 ft x 9 ft elliptical corrugated metal plate pipe carrying a live stream, with a double 10 ft x 8 ft concrete box culvert with headwalls. Barnett Shoals Road Sidewalk Gap project includes completion of a sidewalk gap. The proposed improvement incorporates relocation of one bus stop, installation of a new controlled midblock crosswalk, and installation of accessibility ramps.