Project Statement
This program will provide continuation of preventive road and bridge maintenance, road reconstruction, and/or rehabilitation activities for various streets and roadways throughout ACC. Depending upon actual costs and funding availability, improvements may include, but are not limited to: crack sealing, full depth patching, resurfacing, roadway reconstruction with the intent to preserve and/or extend the life of existing roadways, in addition to bridge maintenance, bridge improvements, bridge repairs, and/or bridge replacements.
This is a continuation of the SPLOST 2005, SPLOST 2011, and TSPLOST 2018 Program funding. To the extent allowed by law, budgeted project funds may be used as matching funds for leveraging grant opportunities.
Additionally, to the extent allowed by law, other funding sources, including, but not limited to, grants, may be utilized to offset and/or reduce the project budget. Any unspent project funds that accrue as a result of the receipt of grants or other funding sources may be assigned to other approved TSPLOST projects.