Sub-Project 7: Oak/Oconee Bridge Underpass

MLK Greenway Extension Map

Project Details

Sub-Project #7 is to provide an at grade connection between the greenway trail sections on either side of the Oak/Oconee Street bridge. The project is being planned to be built at the same time as the GDOT bridge over Oak/Oconee Street is being replaced.   

Project Updates

GDOT continues to work on the Final Design, heading to an October 2023 let date. Coordination with GDOT on permitting and schedule is moving along.  ACCGOV is contracting with the firm Gresham Smith to perform the design and permitting portions of the greenway trail under the bridge at the same time as they are doing the work for GDOT.

The Project was presented at M&C Work Session on May 12, 2020 which can be viewed at https://youtu.be/6y4GXn0A_2s?t=1282. On June 2, 2020 M&C approved the preliminary plans.

For detailed information, images, presentations, and drawings for this project please visit this link.

*as of 4/23/2021