 Road Closures
 Catawba Avenue from 183 - 190  October 5 - 8, 2021  Install water stub across the street  ACC Meter Management
 Fowler Mill Rd from Bob Wages Road - Pinenut Lane
 Until Notified
 Road Work
 ACC Streets and Drainage
 Milledge Circle from Highland Avenue - Highland Terrace  November 4, 2021  Residential tree removal and pruning work  New Urban Forestry
 S. Poplar Street Street from 150' South of Firefly Trail - 150' North of Firefly Trail  October 21 - November 30, 2021  Loading and offloading equipment, rock blasting, dump truck staging  Shawn Springton
 S Newton Street from Waddell - Baxter Street  August 23 - October 21, 2021  Sewer installation ACC Public Utilities
 184 Towns Walk Drive from Towns Walk - Towns Shed Way  October 11, 2021  Tree removal  New Urban Forestry
Sidewalk 
 Boulevard Avenue from Grady Avenue - Lyndon Avenue  September 27 - October 30, 2021  Bore 1707" bore on Boulevard  Crown Castle
 Boulevard Avenue from N Chase Street - Nantahala Avenue  September 27 - October 30, 2021  Bore 900' on Boulevard Avenue continuing 573" on N Chase Street  Crown Castle
 Chattooga Avenue from Nacoochee Avenue - cul de sac Chattooga Avenue  September 27 - October 30, 2021  259' bore 25' trench on Chattooga Avenue  Crown Castle
 Clover Street from corner of Edwards Street - Gloria Street  September 13 - October 13, 2021  Direct bore 437' & trench 5' on Clover Street  Crown Castle
 Edwards Drive from Clover Street - Sunset Drive  September 13 - October 13, 2021  Bore 410' along Edward Drive; bore 112' continued to Sunset Drive  Crown Castle
  Hiawassee Avenue from Boulevard Avenue - Lenoir Avenue
 September 27 - October 30, 2021
 460' bore on Hiawassee Avenue and 410' bore on Lenoir Avenue
 Crown Castle
 Hiawassee Avenue from Nantahala Avenue - Boulevard Avenue  September 27 - October 30, 2021  384' bore 5' trench on Hiawassee Avenue  Crown Castle
 Hill Street from N Harris Street - N Church Street  September 13 - October 13, 2021  Bore 285' & trench 3' on Hill Street  Crown Castle
  King Avenue from Hart Avenue - Holman Avenue
  September 27 - October 30, 2021
 207' bore on King Avenue to 320' bore on Holman Avenue
 Crown Castle
  Lyndon Avenue from Boulevard Avenue - Cohen Street
 September 27 - October 30, 2021
 795' bore on Lyndon Avenue
 Crown Castle
 Nantahala Avenue from N Chase Street - Wynburn Avenue
  September 27 - October 30, 2021
 448' bore on Nantahala Avenue
 Crown Castle
 N Chase Street from Nantahala Avenue - Chattooga Avenue  September 27 - October 30, 2021  360' bore 4' trench on N Chase Street  Crown Castle
 S. Poplar Street from 150' south of Firefly Trail - 150' north of Firefly Trail  October 21 - November 30, 2021  Loading and offloading equipment, rock blasting,, dump truck, staging  Shawn Springton
 Sunset Terrace from 235 Sunset Terrace - Sunset Drive  September 13 - October 13, 2021  Bore 80' on Sunset Terrace  Crown Castle
 ​Lane Closures
 Atlanta Hwy from Epps Bridge Parkway - Epps Bridge Road  October 18 - November 1, 2021  Tree work  ACC Landscape Management
 Belvoir Heights from Talmadge Drive - Crestview Circle  September 20 - October 30, 2021  365' bore on Talmadge continuing on Belvoir Heights with 200'bore & 42' trench  Crown Castle
 Boulevard Avenue from Boulevard Heights - Pound Street  September 27 - October 30, 2021  Bore 737' bore on Boulevard Avenue and 182' bore 3" trench on Pound Street  Crown Castle
 Boulevard Avenue from Grady Avenue - Lyndon Avenue
  September 27 - October 30, 2021
  Bore 1707" bore on Boulevard
 Crown Castle
  Boulevard Avenue from N Chase Street - Nantahala Avenue
  September 27 - October 30, 2021
  Bore 900' on Boulevard Avenue continuing 573" on N Chase Street
  Crown Castle
 Chattooga Avenue from Nacoochee Avenue - cul de sac Chattooga Avenue
 September 27 - October 30, 2021
 259" bore 25' trench on Chattooga Avenue  Crown Castle
 Clayton Street from Pulaski Street - Thomas Street  October 1 - 31, 2021  Christmas light; No work on Fridays or Game Day Saturdays  ACC Landscape Management
 Cleveland Avenue from 224 - 228  October 18 - 21, 2021  Install water stub across street  ACC Meter Management
Clover Street from Corner of Edwards - Clover Street  September 9 - October 13, 2021  Direct bore 168' on clover Street  Crown Castle
 Edwards Drive from Hawthorne Avenue - Clover Street  September 13 - October 13, 2021  Direct bore 520' on Edwards Drive trench and place 5'  Crown Castle
 Edwards Drive from Sunset Drive - Willow Run  September 20 - October 30, 2021  1337' bore 3' trench along Edwards Drive between Sunset Drive and Willow Run  Crown Castle
 Epps Bridge Parkway from Atlanta Highway - County line  October 18 - November 1, 2021  Tree work  ACC Landscape Management
 Grady Avenue from Boulevard - Dubose Avenue  September 27 - October 30, 2021  667' bore 3' trench on Grady Avenue  Crown Castle
 Hawthorne Avenue from Edward Drive - Gilmer Street  October 6 - November 15, 2021  Bore 440' along Hawthorne Avenue  Crown Castle
 Hiawassee Avenue from Boulevard Avenue - Lenoir Avenue  September 27 - October 30, 2021  460' bore on Hiawassee Avenue and 410' bore on Lenoir Avenue  Crown Castle
  Hiawassee Avenue from Nantahala Avenue - Boulevard Avenue
  September 27 - October 30, 2021
 384' bore 5' trench on Hiawassee Avenue
 Crown Castle
 Hill Street from N Harris Street - Milledge Avenue  October 6 - November 12, 2021  220' bore on Hill Street  Crown Castle
 Hill Street from N Harris Street - N Church Street  September 13 - October 13, 2021  Bore 285' & trench 3' on Hill Street  Crown Castle
 King Avenue from Hart Avenue - Holman Avenue  September 27 - October 30, 2021  207' bore on King Avenue to 320' bore on Holman Avenue  Crown Castle
 282 Lombardy Drive  from Catalpa Drive - dead end  October 18 - November 15, 2021  Replacing cross drainage pipe  ACC Streets & Drainage
 Lyndon Avenue from Boulevard Avenue - Cohen Street  September 27 - October 30, 2021  795' bore on Lyndon Avenue  Crown Castle
 Morningview Drive  September 22 - October 22, 2021 Resurfacing road Southeastern Paving & Grading
 Nantahala Avenue from N Chase Street - Wynburn Avenue  September 27 - October 30, 2021  448' bore on Nantahala Avenue  Crown Castle
 Nantahala Ext from Buena Vista Avenue - Pound Street  September 27 - October 30, 2021  Bore 93' along Nantahala Extension with a portion along Buena Vista  Crown Castle
 Nantahala Avenue from N Chase Street - Wynburn Avenue  September 27 - October 30, 2021
 448' bore on Nantahala Avenue  Crown Castle
  N Chase Street from Nantahala Avenue - Chattooga Avenue
 September 27 - October 30, 2021
 360' bore 4' trench on N Chase Street
 Crown Castle
 Oglethorpe Avenue from Mia Lane - Normal Avenue  October 14 - 26, 2021  Lane closure for vehicle access only and sidewalk closure for tie-in  Atlanta Gas Kught
 Prince Avenue from corner of Barber Street - corner of Prince Avenue  September 13 - October 13, 2021  Bore 44' and trench and place 16' on Prince Avenue at corner of Barber Street  Crown Castle
 S. Barnett Shoals Road from Milford Drive - Red Fox Run  October 4 - 18, 2021  Tree work  ACC Landscape Management
 Sunset Drive from Gilmore Street - Edwards Drive  September 20 -October 30, 2021  Bore 300' and trench 3' on Sunset Drive  Crown Castle
 Sunset Terrace from 235 Sunset Terrace - Sunset Drive  September 13 - October 13, 2021  Bore 80' on Sunset Terrace  Crown Castle
 Sylvan Road from Talmadge Drive - Pineneedle Road  October 6 - November 15, 2021  Bore 700' along Sylvan Rd  Crown Castle
 Talmadge Drive from Westover Drive - Pineneedle Road  September 20 - October 30, 2021  Bore 431' Talmadge Drive  Crown Castle
 Thomas Street from Broad Street - Dougherty Street  October 1 - 31, 2021  Christmas lights; No work on Fridays or Game day Saturdays  ACC Landscape Management
 Timothy Road & Pinewood Circle from Cypress Manor Lane - Lakeview Road  October 4 - 26, 2021  Lane closure for tie-in and vehicle access  Atlanta Gas Light
 W. Hancock Avenue from W. Broad Street - N Rocksprings Street  October 6 - November 15, 2021  400' bore 3' trench on W Hancock Avenue  Crown Castle
 Willow Run from Pineneedle - Edwards Drive  September 20 - October 20, 2021  Bore 703' and trench 5' on Willow Run  Crown Castle
 Winterville Road from Lexington Road - Nellie B Avenue  October 18 - November 1, 2021  Tree work  ACC Landscape Management
 Yonah Avenue from Buena Vista Avenue - Boulevard Avenue  October 11 - November 30, 2021  Bore 559' along Yonah Avenue & Buena Vista Avenue  Crown Castle
Lane Restrictions
 Adar Street  July 2 - September 25, 2021  Patching, Chip seal, Crack seal  Pittman Construction
 Annes Court (patch only)  September 26 - October 30, 2021  Patching, paving, chip seal, crack seal  Pittman Construction
 Baldwin Street (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Barrow Street  August 29 - October 30, 2021   Patching, Chip seal, Crack seal
 Pittman Construction
 Baxter Street (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Benning Street   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Bethany Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Bowden Lane  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Buford Way   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Burnett Street  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Carrie Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Castalia Avenue  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Catalpa Lane  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Catalpa Way   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Cedar Springs Drive   July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Childs Street   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Derby Street   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Elizabeth Street   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Epps Bridge Parkway (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Fortson Drive (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Franklin Street   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Freeman Circle   August 29 - 
October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Greenwood Lane  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Harve Mathis Road (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Henderson Extension   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Henry Meyer Road July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Hill Chapel Street   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Huntly Glenn  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Johnson Drive  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Kelli Drive  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Kerby Lane  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Kingston Way  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Lake Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Lake Place  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Lakeside Drive (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Lauren Lane   July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Le Conta Avenue  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Lindmar Court  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Lynwood Court  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Madison Heights   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Mandy Drive   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Maynard Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Melba Lane  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Melbourne Place  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Milledge Avenue Extension  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Mount Vernon Place (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 N Chase Street from 810 - 850  September 27 - October 30, 2021  Installation of Verizon equipment on existing utility pole Network Installation Specialist
 Nantahala Street   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 N Newton Street   August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Northview Street  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Oakdale Road  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Old Commerce Road    August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Old Epps Bridge Road (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Old Hull Road (patch only)  July 2 - October 30, 2021
 Patching
  Pittman Construction
 Old Will Hunter Road and Macon Highway - 605  September 27 - October 15, 2021  Installation of Verizon equipment on existing pole  Network Installation
 Olympic Drive  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Orion Place  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Parkway Drive  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Plumnelly Road (patch only)  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Pound Street    August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Rocksprings Court    August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Rose Avenue    August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 Russell Way  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Seasons Pass   July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Sedgewood Drive July 2 - October 30, 2021
Patching, Chip seal, Crack seal
  Pittman Construction
 Scott Street  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Sharon Circle  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Sharon Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Skyline Ridge  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Skyline Way  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Southfort Court  September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 800 S. Lumpkin Street  October 4 - 29, 2021  Installation of Verizon equipment on existing utility pole  Network Installation
 Stonybrook Drive  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
  Tallassee Road (patch only)
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Terrell Drive
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Tipperary Court
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Tipperary Road
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Towns Walk Drive
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Towns Walk Lane
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Urbana Way (patch only)
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Walker Drive    August 29 - October 30, 2021
 Patching, Chip seal, Crack seal
 Pittman Construction
 W Broad Street from 1900 - 1918
 September 20 - October 4 2021
 Installation of Verizon equipment on existing utility pole
 Network Installation Specialists
 Westchester Drive
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Westchester Drive
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 West Lake Drive (patch only)
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  White Court
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Whitehead Road (patch only)
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 White Terrace
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
  Wildwood Court
 September 26 - October 30, 2021
 Patching, paving, chip seal, crack seal
 Pittman Construction
 Winthrop Court  July 2 - October 30, 2021
 Patching, Chip seal, Crack seal
  Pittman Construction
 Winterville Road  July 2 - October 30, 2021
Patching, Chip seal, Crack seal
  Pittman Construction

 

Special Events