Sub-Project #4 – Taxiway “B” Pavement Rehabilitation and Lighting Project
Sub-Project #4 Details:
Taxiway “B” is the main taxiway to the secondary runway 2-20. The rehabilitation project will consist of milling the old pavement and replacing it with a soil cement base and then applying 4-6 inches of asphalt as a final layer. The project will include new lighting and signage along with new pavement markings. The current pavement is over 25 years old and is in poor condition. Poor condition is considered unsafe by FAA standards due to loose pavement that can be ingested by a jet engine or hit by an aircraft propeller.
Sub-Project #4 Update
The Project Concept for Taxiway “B” Pavement Rehabilitation and Lighting Project was approved by Mayor & Commission on May 07, 2024.