Installation of approximately 8,715 linear feet of 24-inch and 288 linear feet of 12-inch ductile iron pipe gravity sewer and appurtenances including concrete precast manholes, stream crossings, and erosion and sedimentation control. The project is located in areas generally parallel and to the east of Newton Bridge Road beginning near Maxey Boulevard on the downstream end and extending upstream to North Industrial Drive. Approximately 5,279 linear feet of the sewer is same-trench replacement of existing sewer. By-pass pumping of the gravity sewer flow during construction will be required.
|
|
12/15/2020 10:00 AM
|
|
1/29/2021 3:00 PM
|
|
PRIVATE
|
|
Toro Holt, Senior Buyer, at 706-613-3068, or accbids@accgov.com
|
|
YES
|
|
NONE
|
|
08:00 AM TO 05:00 PM
|
|
706-613-1975
|
|
|
|