December 11, 2025 9:00 AM - 5:00 PM 120 West Dougherty Street Administrative Meetings (what does this mean?)
|
|
|
|
|
|
PR-2025-11-2371 | 1075 Gaines School Rd, Heartland Dental - Athens GA (Tenant Improvements) | Interior renovation - second-generation tenant build-out within an existing shell building for a new dental business tenant. See PR-2025-10-2050 for site plans. | Contact: Brad McCullough, Architectural Principles LLC, mccullough.bm@architecturalprinciples.com |
| PR-2025-11-2255 | 585 Vine St, East Athens Wellness Experience | Site - The project consists of the addition of a community garden along with parking lot, stormwater, streetscape and landscaping improvements. See PD-2025-07-1351 for related Planned Development amendment. Project consists of 5 parcels. | Contact: Brandy Seong, W&A Engineering, bseong@waengineering.com |
| PR-2025-11-2260 | 665 Barber St, 665 Barber Street | Site - Building addition, new construction, utility connections, and related site work to support development. | Contact: Elizabeth Hargrove, Koons Environmental Design, elizabeth@koonsdesign.com |
| PR-2025-11-2332 | 6425 Jefferson Rd, Catedral de Fe - Modular Addition | Site & Building - Placement of a modular 24'x60' classroom adjacent to existing church building w/ joint use of water and sewer utilities. Street frontage trees will be added in accordance with ordinances. | Contact: Azael Garza, Aztlan Engineering, A.Garza@AztlanEngineering.com |
| PR-2025-11-2353 | 4014 Lexington Rd, Take 5 Oil Change - Lexington Rd - Athens | Site - new Oil Change Service to include 1,500sf building and parking. Demolition of existing building and site reconfiguration. | Contact: Michael D. Ritch, SDG Engineering, mdritch@comcast.net |
| PR-2025-11-2356 | 368 Rivergrove Pkwy, River Snap Phase 1 | Site - development of single-family attached units - 74x townhome units under a condo association named River Snap Phase 1, within the Snapfinger overall PD. | Contact: Jakob Sullins, Sullins Engineering, jakesullins@gmail.com |
| PR-2025-11-2367 | 390 E Washington St, 390 E Washington Bus Parking | Site - demolition of existing retail building and replace with paver/concrete courtyard/bus parking | Contact: Frank Pittman, Pittman & Greer Engineering, fpittman@pittmangreer.com |
|
|
|
|
|
|