October 16, 2025 9:00 AM - 5:00 PM 120 West Dougherty Street Administrative Meetings (what does this mean?)
|
|
|
|
|
|
PR-2025-09-1976 | 3455 Atlanta Hwy, 7 Brew | New construction of a prefabricated modular building for a drive thru coffee shop | Contact: Carlos Garza, Tayva Holdings LLC, carlos@tayvaholdings.com |
| PR-2025-10-2006 | 198 College Ave, Sunroof Coffee Downtown | Interior renovation - new coffee shop upfit in existing space with existing kitchen. Previous tenant was also coffee shop. Existing interior stair connecting tenant space to upstairs tenant space will be removed. | Contact: Paul Mosher, Patchdesign, paul@patch-design.com |
| PR-2025-10-2002 | 1324 S Milledge Ave, 1324 S Milledge Ave | Full interior renovation of the existing building - replacing rotten windows, doors, facade, and roof on exterior - to re-establish 4 multifamily residential units. | Contact: Cam Hopkins, Hopkins Construction, cam@gchopkinsconstruction.com |
| PR-2025-09-1938 | 345 W Hancock Ave, Milestone Construction Parking | Site - Parking lot expansion; renovation of existing plaza and terrace near the building. | Contact: Brock Corbin, brock@koonsdesign.com |
|
|
|
|
|
|