Pen drawing of design plan

October 2, 2025
9:00 AM - 5:00 PM
120 West Dougherty Street
Administrative Meetings

(what does this mean?)

View this week's Plans Review Agenda
View this week's Location Maps



PR-2025-09-1875

855 Gaines School Rd, La Parrilla Tower Place

Interior renovation of existing restaurant space, including upgrades to electrical and plumbing systems, installation of new doors, and construction of non-load-bearing wood partition walls.

Contact: Christopher Evans, E + E Architecture, chris@enearchitecture.com 



PR-2025-09-1876

558 W Broad St, MELTWICH

Interior buildout for a new restaurant in an existing 1602 SF shell space

Contact: Samwel Kimani, KSI Design Group, LLC, ksidesign@outlook.com 



PR-2025-09-1914

485 Newton Bridge Rd, North Athens Dentistry Building Front Improvement

Improvements to the front of existing building, including a demolition and addition of entrance structure.
 
 See Concept Review PR-2025-08-1594.

Contact: Dongjun Seo, VIV Architects, djs@vivarchitects.com 



PR-2025-09-1922

159 Marlin St, Short Term Rental for 159 Marlin St.

New Commercial Short-Term Rental.
 
 See SUP-2025-05-1059 for Special Use approval.

Contact: Adam Killgo, akillgo@yahoo.com 



PR-2025-08-1616

4710 Atlanta Hwy, Top Notch Training

Site - project includes parking spaces, drive aisle, septic area, stormwater management area, and utility connections for construction of a 10,400 sf baseball training facility building

Contact: Jeff Walker, Foresite Group, LLC, jwalker@fg-inc.net 



PR-2025-09-1856

170 International Dr, 170 International Drive Subdivision

Site - new single family subdivision with 19 residential lots.
 
 See PREP-2025-02-0328 for preliminary plat.

Contact: Frank Pittman, pittmangreer, fpittman@pittmangreer.com 



PR-2025-09-1851

1315 Spring Valley Rd, Christian Lake Dam Remediation

Concept Review Only - The project consists of the modification of the existing lake (Christian Lake) dam to manage stormwater for future development of the site. The improvements will include dam grading modifications, spillway construction and installation of box culvert

Contact: Brandy Seong, WAEngineering, bseong@waengineering.com 



PR-2025-09-1854

295 E Dougherty St, Hub II Athens

Concept Review Only - Hub II Athens Mixed-Use Residential - The project consists of the re-development of the site into a mixed-use development along with road improvements along E Dougherty St, Jackson St and Hoyt St. There will be paved drives, on-street parking, parking deck, utilities, stormwater management, etc.

Contact: Brandy Seong, WAEngineering, bseong@waengineering.com 



PR-2025-09-1857

295 E Dougherty St, College Avenue Sanitary Sewer Improvements

Concept Review Only - The project consists of improvements to an existing Public Sewer System Infrastructure along public right of way, and will include grading, drainage, and roadway construction.

Contact: Brandy Seong, WAEngineering, bseong@waengineering.com 



PR-2025-09-1858

295 E Dougherty St, Hub II Athens Parking Deck

Concept Review Only - Hub II Athens Parking Deck - The project consists of the re-development of the site into a mixed-use development along with road improvements along E Dougherty St, Jackson St and Hoyt St. There will be paved drives, on-street parking, parking deck, utilities, stormwater management, etc.

Contact: Brandy Seong, WAEngineering, bseong@waengineering.com 

 



View the complete Plans Review agenda 

https://accgov.com/Archive.aspx?ADID=4784

Athens-Clarke County Planning Department   |   706-613-3515   |   planning@accgov.com

Share on Facebook
Share on Twitter
Share via Email

Copyright 2024 - Athens-Clarke County Unified Government (ACCGov)
Athens-Clarke County Unified Government | P.O. Box 1868 | Athens, GA 30603

Powered by
CivicSend - A product of CivicPlus